Meeting Minutes 2003
|
|
|
|
|
Meeting
No. |
Date |
Main Topics |
2003-01 |
27-JAN-2003 |
Approval of the Minutes, Crossing Angle Stability,
Discussion on Updating the User Requirements for the LHC Data Exchange
(LHC
Data Interchange WG (LDIWG) Final Report Phase 1) |
2003-02 |
31-MAR-2003 |
Approval of the Minutes, Discussion on Updating the User
Requirements for the LHC Data Exchange (AB/BDI
Table), Orientation of the Inner Triplet
Beam Screens, Luminous Region in Heavy-ion
Collisions, Protection Elements @
Injection for ALICE/LHCb |
2003-03 |
12-MAY-2003 |
Approval of the Minutes, Discussion on
Experiment-Accelerator Interface Issues for the TTC System, Update on
Accelerator -> Experiment Data Exchange, Proposal
for Updating the Experiment -> Accelerator Data Exchange |
2003-04 |
07-JUL-2003 |
Approval of the Minutes, Beam
Synchronous Timing Receiver Interface, Cables for BPTX Monitors,
Racks for Experiment-Machine Interface Systems in Experimental Areas (SR
Bldgs., Alcoves), LHC
Commissioning and First Year of Operation, Satellite
Bunches, Status of LHC Luminosity Monitor (Luminometer) Functional
Specification |
2003-05 |
18-AUG-2003 |
Approval of the Minutes, Comments on Specifications
(Beam Synchronous Timing receiver Interface for the Beam Observation
System, LHC Luminosity Monitor), Update on Racks for Machine-Experiment
Interface Systems in the Underground Areas, Proton and Ion Bunch
Disposition for the LHC, Proposal for BPTX Read-out based on ALICE TOF
Electronics |
2003-06 |
27-OCT-2003 |
Approval of the Minutes, Updated
Nominal LHC Beam Parameters, Status of LHC Luminosity Monitor (Luminometer),
Luminosity Monitoring Installation at IR2 & IR8,
Alternatives for BPTX Read-out |
2003-07 |
15-DEC-2003 |
Approval of the Minutes, Preliminary Report on the
Luminometer Calibration, Update on Luminosity Monitoring
Installation at IR2, Report on Longitudinal
Profile Monitor, RF Range for LHC Ion
Operation, TTC Issues |
|
|
|
|
|