CERN Homepage

Meeting Minutes 2003

wpe2.jpg (13354 bytes)

Meeting
No.
Date Main Topics
2003-01 27-JAN-2003 Approval of the Minutes, Crossing Angle Stability, Discussion on Updating the User Requirements for the LHC Data Exchange (LHC Data Interchange WG (LDIWG) Final Report Phase 1)
2003-02 31-MAR-2003 Approval of the Minutes, Discussion on Updating the User Requirements for the LHC Data Exchange (AB/BDI Table), Orientation of the Inner Triplet Beam Screens, Luminous Region in Heavy-ion Collisions, Protection Elements @ Injection for ALICE/LHCb
2003-03 12-MAY-2003 Approval of the Minutes, Discussion on Experiment-Accelerator Interface Issues for the TTC System, Update on Accelerator -> Experiment Data Exchange, Proposal for Updating the Experiment -> Accelerator Data Exchange
2003-04 07-JUL-2003 Approval of the Minutes, Beam Synchronous Timing Receiver Interface, Cables for BPTX Monitors, Racks for Experiment-Machine Interface Systems in Experimental Areas (SR Bldgs., Alcoves), LHC Commissioning and First Year of Operation, Satellite Bunches, Status of LHC Luminosity Monitor (Luminometer) Functional Specification
2003-05 18-AUG-2003 Approval of the Minutes, Comments on Specifications (Beam Synchronous Timing receiver Interface for the Beam Observation System, LHC Luminosity Monitor), Update on Racks for Machine-Experiment Interface Systems in the Underground Areas, Proton and Ion Bunch Disposition for the LHC, Proposal for BPTX Read-out based on ALICE TOF Electronics
2003-06 27-OCT-2003 Approval of the Minutes, Updated Nominal LHC Beam Parameters, Status of LHC Luminosity Monitor (Luminometer), Luminosity Monitoring Installation at IR2 & IR8, Alternatives for BPTX Read-out
2003-07 15-DEC-2003 Approval of the Minutes, Preliminary Report on the Luminometer Calibration, Update on Luminosity Monitoring Installation at IR2, Report on Longitudinal Profile Monitor, RF Range for LHC Ion Operation, TTC Issues

Send Mail to EDMS Support