Meeting No. (click for
the minutes) |
Date |
Main Topics (click for the
presentation) |
2005-01 |
31-JAN-2005 |
Approval of the Minutes,
Experimental Equipment Directly
Interfering with the Beam,
Safe LHC Operation Parameters and the Beam
Interlock System,
Feedback from Chamonix XIV |
2005-02 |
21-MAR-2005 |
Maintenance of TTC Units,
LHC
Beam Abort Status,
The ATLAS Luminosity Monitor "LUCID",
Radiation Monitoring for CMS |
2005-03 |
25-APR-2005 |
Status of Studies on
Fast Interlock Signals, RF Signal
Inputs to the TTC |
2005-04 |
20-JUN-2005 |
Racks for LHC Timing,
Status of Functional
Specification on LHC Experiment Beam Interlocks,
Collision Rate Monitors,
Read-out of BPTX |
2005-05 |
05-SEP-2005 |
Racks for LHC Timing, Status of Functional Specification
on LHC Experiment Beam Interlocks, Status of Data Interchange Protocol |
2005-06 |
07-NOV-2005 |
Proposed Upgrade to TTC System, Summary of Data Exchange
between Experiments and Accelerator, Status of Functional
Specification on LHC Experiment Beam Interlock |
2005-07 |
05-DEC-2005 |
Summary of Data Exchange between Experiments and
Accelerator, Status of Collision-Rate Monitors, Demonstration of DIP,
Demonstration of TIMBER |