CERN Homepage

Meeting Minutes 2005

wpe2.jpg (13354 bytes)

Meeting No.

(click for the minutes)

Date Main Topics

(click for the presentation)

2005-01 31-JAN-2005 Approval of the Minutes, Experimental Equipment Directly Interfering with the Beam, Safe LHC Operation Parameters and the Beam Interlock System, Feedback from Chamonix XIV
2005-02 21-MAR-2005 Maintenance of TTC Units, LHC Beam Abort Status, The ATLAS Luminosity Monitor "LUCID", Radiation Monitoring for CMS
2005-03 25-APR-2005 Status of Studies on Fast Interlock Signals, RF Signal Inputs to the TTC
2005-04 20-JUN-2005 Racks for LHC Timing, Status of Functional Specification on LHC Experiment Beam Interlocks, Collision Rate Monitors, Read-out of BPTX
2005-05 05-SEP-2005 Racks for LHC Timing, Status of Functional Specification on LHC Experiment Beam Interlocks, Status of Data Interchange Protocol
2005-06 07-NOV-2005 Proposed Upgrade to TTC System, Summary of Data Exchange between Experiments and Accelerator, Status of Functional Specification on LHC Experiment Beam Interlock
2005-07 05-DEC-2005 Summary of Data Exchange between Experiments and Accelerator, Status of Collision-Rate Monitors, Demonstration of DIP, Demonstration of TIMBER

Send Mail to EDMS Support