CERN Homepage

Meeting Minutes 2004

wpe2.jpg (13354 bytes)

Meeting
No.
Date Main Topics
2004-01 09-FEB-2004 Approval of the Minutes, TTC Coordination Issues, Recapitulation on the RF Range, Beam Condition Monitor, Ions for the LHC Project
2004-02 29-MAR-2004 Approval of the Minutes, TTC Coordination Issues, BPTX Cabling, LHC Machine Slow Signal Reception, Requirements of Experiments on the BST (CMS, LHCb), The Functionality of the New CTX Machine Timing Card, Beam Synchronous Timing via the TTC System, LHC Initial Operation at Lower Energy
2004-03 17-MAY-2004 Approval of the Minutes, Optical Splitter for TTC Distribution, Organisation of TTC Coordination, Luminosity Measurement & Monitoring at Point 1, Report from the LHC Data Interchange Working Group
2004-04 14-JUN-2004 Approval of Minutes, Matters Arising (Detectors for Collision Rate Monitors, Archiving of Information on LHC Data Interchange Bus, TTC), Report on Beam Loss Monitors
2004-05 02-AUG-2004 Approval of Minutes, The LHC Logging System, Report on the TTC System, Optical Splitter for the TTC Distribution, Structured Beam Tests at the SPS
2004-06 06-SEP-2004 Approval of Minutes, Timing Issues from SPS Structured Beam, Proposal for New BPTX Position, Report on LHC Luminometers, Luminosity Monitor Installation in IR2 & IR8, Flat-top Energy Stability at the LHC

Send Mail to EDMS Support